Implement your SHE Management system from scratch with the help of BS8555
- September 18th, 2007
How many of us know when and where to start with the implementation process of an Occupational Health, Safety and Environmental (SHE) Management System?
Many issues need to be addressed such as the cost of the implementation, what resources will be needed, the time it will take to implement and the cost involved.
A useful tool to consider when starting with the implementation process is the BS8555 Management System Implementation Plan.
BS8555
This standard was introduced in 2003 to help SMEs to achieve ISO14001 by taking a phased approached to implementing an Environmental Management System (EMS). The phased EMS implementation approach used by BS 8555 breaks down the process of installing a formal EMS into five levels. A sixth level allows organisations to develop systems, with the possibility of seeking recognition against the internationally accepted
EMS standard, ISO 14001.
After each phase of the scheme has been implemented, the organisation can either assess themselves through internal audits, allow major customers to assess them against the appropriate phase criteria or be assessed by a third party to ensure that the requirements of each phase have been met.
As part of Phase 6, the organisation can choose to have an additional audit to ensure that the organisation’s EMS meets all of the requirements of ISO 14001 and if successful the organisation would receive an ISO 14001 certificate.
BS8555 ADAPTED
With the new OHSAS18001 now even more closely aligned with ISO14001 than ever before, it just made sense to use and adapt this tool for Integrated management system implementation.
I have hereunder applied the BS8555 to the concept of SHE integration. What follows is a synopsis of this document (adapted).
This document consists of a six phase plan on implementing a system:
- Seven Stage Profile
- Gaining & Maintaining Managements Commitment
- Baseline Risk Assessments
- Developing a draft SHE Policy
- Developing SHE Indicators
- Develop an Initial SHE Implementation Plan
- Training, Awareness, Competence & the initiation of the Culture Change
- Initiation of continual improvement
- Four Stage Profile
- Identify relevant legal requirements
- Identify other requirements
- Check compliance with legal & other requirements
- Ensuring compliance
- Developing compliance indicators
- Seven Stage Profile
- Evaluation of aspects, impacts, hazards & risks
- Finalizing the SHE Policy
- Developing objectives and targets
- Establish indicators for SHE performance evaluation
- Develop the SHE management programme
- Develop operational control procedures
- Launch the policy, objectives, targets & indicators
- Six Stage Profile
- Finalize management structure and responsibilities
- Training, awareness & competence plans & records
- Establishing & maintaining formal communication
- Documentation & record keeping
- Reviewing and Testing Emergency Preparedness & Response
- Measuring features of the SHE Management System
- Five Stage Profile
- Establishing Audit programmes
- Correcting Non-conformances & Taking preventive action
- Management Review
- Improving SHE Performance
- Improving the SHE Management System
- Six Stage Profile
- Preparing for External Assessment & of the SHE Management System (ISO14001 & OHSAS1800)
- Review Baseline
- Review of Implementation
- Develop Reportable Information
- Auditing the System & Performance
- Preparing for verification & certification
Each of these sections/divisions is then further divided into a project start and finish date (divided further into quarters); a project leader is assigned; & budgeted and actual costs is identified.
An example of the format is:
If you would like to comment on this article or for further information regarding this wonderful tool, you are welcome to use the comment function hereunder.
2 Responses to “Implement your SHE Management system from scratch with the help of BS8555”
Leave a Reply
Differentiating between a SHE File and a SHE Plan
There is a common misperception that the SHE File and the SHE Plan is one and the same thing. This is incorrect. The SHE Plan forms part of the SHE …
November 10th, 2009 & Filed in Health & SafetyHow to implement a job safety analysis process
Success at implementing a job safety analysis process depends partly on the frequency of its use. If your team had produced a valuable business management tool, make it a living …
October 14th, 2009 & Filed in Health & Safety, UncategorizedHealth and Safety Inspection Checklist
Due to popular demand, we return to an example of a section of a health and safety representative inspection checklist.
It is important to notice that there is a BIG difference …
September 15th, 2009 & Filed in Health & Safety, UncategorizedThe Causes & Effects of Incidents
Causes of Incidents
Incidents can be generally defined as being the result of unsafe workplace conditions, acts, or poor decision making by someone in the chain of events. Statistics differ, but …
August 17th, 2009 & Filed in Health & Safety, Uncategorized









September 26th, 2009 at 5:29 pm
Hello Christel, I am the SHE Co-Ordinator for Duco Speciality Coatings (part of the Chemserve Group). Could you please email an example of the BS8555 implementation form - I am unable to access the link above.
Thanks so much.
Kind regards
Margi Reid
September 29th, 2009 at 9:27 pm
Hi Margi
The BS5888 focusses on Environment only - I have however redesigned it to include H&S as well - I am forwarding this doc to you via your e-mail address. Regards Christel.